New Technical

Wall Hung Basin

The rag should be first grouted into the wall using cement or concrete, as per the distance between slots provided in the wash basin. The bolts should be fixed perpendicular to the wall.

The rag should be first grouted into the wall using cement or concrete, as per the distance between slots provided in the wash basin. The bolts should be fixed perpendicular to the wall.

Allow cement/ concrete to set. Check if the rag bolts are firmly fixed. Fix the wash basin in the bolts using nuts and washer.

Concealed Wall Hung

If the thickness of the plaster and tile are lesser than the dimensions mentioned above, the bolts that are supplied along with the bracket should be moved into the wall by using a suitable spacer washer between the bolt head and the bracket frame.

Allow cement/ concrete to set. Check if the rag bolts are firmly fixed. Fix the wash basin in the bolts using nuts and washer.

The bracket should be buried into the floor so that the height from the centerline of the bolt to the surface of the finished floor is 320.